OPTIMIZATION OF THE TUBE-BUNDLE ARRANGEMENT IN HORIZONTAL STEAM GENERATORS

    loading  Checking for direct PDF access through Ovid

Abstract

Experience in operating steam generators with various tube-bundle arrangements is analyzed. Ways to improve the construction are indicated. The results of computational–theoretical studies are presented. These studies show that a corridor arrangement of a tube bundle is more advantageous.

Related Topics

    loading  Loading Related Articles