Determining a reasonable concession period for private sector provision of public works and service

    loading  Checking for direct PDF access through Ovid

Abstract

The concession period is one of the most important issues to be addressed in private sector provision of public works and services through concession arrangements as it, to some extent, demarcates the rights and responsibilities between public and private sectors in a project's life cycle, and it is also critical to the project's sustainable development. This paper proposes a methodology for the determination of an appropriate length of the concession based on a win–win principle for parties involved and exercises simulation techniques in measuring and evaluating construction and economic uncertainties and risks. A case study of a hypothetical infrastructure project is provided to demonstrate the application of the proposed methodology, mathematical model, and simulation techniques.

Lorsque des contrats de concession sont utilisés, la période de concession est l'un des enjeux les plus importants à être abordés lors de la fourniture de travaux publics et de services par le secteur privé puisque cette période délimite les droits et les responsabilités entre les secteurs privé et public durant le cycle de vie d'un projet; cela est également important pour le développement durable du projet. Le présent article propose une méthode pour déterminer une durée de concession appropriée en se basant sur le principe gagnant–gagnant pour les parties impliquées et présente des techniques de simulation pour mesurer et raisonner les incertitudes et les risques économiques et de construction. Une étude de cas pour un projet d'infrastructure hypothétique est fournie afin de démontrer l'application de la méthode proposée, du modèle mathématique et des techniques de simulation. [Traduit par la Rédaction]

Related Topics

    loading  Loading Related Articles