Temporal Trends in Disease Severity and Predicted Surgical Risk at the Time of Referral for Echocardiography in Patients Diagnosed with Aortic Stenosis


    loading  Checking for direct PDF access through Ovid

Abstract

Background:Calcific aortic stenosis (AS) is the most common underlying pathology in patients undergoing heart valve surgery, with an expected increasing prevalence among the aging population.Methods and Results:We identified the temporal trends in referral patterns, disease severity, and associated surgical risk among patients with AS between January 1, 1995 and December 31, 2012 at the Duke University Hospital. A total of 6103 patients had a finding of mild (n = 3303), moderate (n = 1648), or severe AS (n = 1152) in a native aortic valve. Overall presence of severe AS increased significantly over time (P = 0.009) with the most substantial increase occurring from 2010 and onward. Median age upon referral (P < 0.001) and attendant predicted surgical risk (P < 0.001) increased significantly in the observation period among patients with a finding of severe AS. Among patients with a finding of severe AS, the proportion of patients aged older than 80 years increased to 51.0% in the most recent time period (2010–2012) compared with 32.6% in the preceding time period (P < 0.001 for overall time trend). Similarly, the proportion of patients with a logistic EuroSCORE greater than 20% increased to 21.3% (2010–2012) from 12.1% (pre-2010).Conclusions:Among patients referred for echocardiography to a high-volume tertiary hospital center, a significant increase in the prevalence of severe AS was observed over time. This trend occurred in parallel with increasing age and predicted surgical risk at referral. Health-care resource planning should account for an increasing number of patients in need of high-risk aortic valve replacements in the near future.

    loading  Loading Related Articles