DISCONTINUITY ZONES IN THE JUNCTION REGION OF TWO MINE TUNNELS

    loading  Checking for direct PDF access through Ovid

Abstract

The boundary integral equation method was used to solve the problem of the stress sate at the junction of two mine tunnels. The regions of rock breaking are obtained using the Mohr strength criterion.

Related Topics

    loading  Loading Related Articles